Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8995

Re: How automatic Safety stock calculation with MRP type PD can be done

$
0
0

Dear SAP gurus,

 

As I explained earlier, My Scenario is as follows

 

1. Due to business scenario, I have to use MRP type PD for Spare parts materials planning. Based of requirements raised from diff storage locations, System will generate Planned orders for the materials at plant level that are having shortages. The period indicator used is monthly.

 

2. User wants to maintain some Safety stock at Plant which they are not able to define and wants system to calculate the same.

 

I require experts input on following.

 

1. Whether System can do automatic safety stock calculation with MRP type PD ?

 

2. If Possible what settings need to be done ?

 

Thanks all for your inputs so far.

 

Best regards,

 

R.Velmurugan.


Viewing all articles
Browse latest Browse all 8995

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>